Construction management

Commercial and industrial builds, delivered around production.

New wood, steel and concrete structures including warehouses, offices, and shops, facility construction, pipeline and tie-in work. Well abandonments and salvage for oil and gas wells including heavy-oil, SAGD and oil sands plants, batteries and lease infrastructure. Every scope of all sizes is managed to a schedule that respects production.

ARES uses a self-developed software called CLASH IQ, an owned AI clash detection app applied to all designed construction projects — construction interferences are found in the design phase and resolved before crews reach the field.

Scope a project
Structural steel and site work on a commercial industrial build

Commercial industrial construction

Completed facility build with crew on site

Facility construction

Concrete, foundations and piling during wellsite abandonment work

Oil/gas wellsite abandonments

Scope of work

Project & construction management

Single-point management of subtrades, materials, permits and documentation, plus design services with AI-based 2D model clash detection so interferences are resolved on screen rather than in the field.

Commercial & industrial builds

Warehouses, multi-level office buildings, shops, storage and support structures, from site prep through commissioning, including structural concrete services: foundations, piles and raft slabs.

Facility construction

Battery, plant and lease facility builds and modifications: structural piling, foundations, piping, skid setting, tie-ins and commissioning support, sequenced around live production.

Well abandonments

Downhole and surface abandonment, cut-and-cap, wellsite decommissioning and reclamation support, executed to provincial regulatory standards with the closure documentation to prove it. Asset salvage and removal functions available.

Inspection & repair

Scheduled inspection and repair programs that catch failures before they take production with them.

Delivery

How a project runs.

01

Site review

We walk it, confirm conditions and identify what the drawings do not show.

02

Scope & schedule

A written scope with crew, equipment, price basis and a date that accounts for production.

03

Execution

One accountable lead on site, daily progress reporting, change control in writing.

04

Handover

As-built documentation, close-out package and the service plan that keeps it running.