Construction management
Commercial and industrial builds, delivered around production.
New wood, steel and concrete structures including warehouses, offices, and shops, facility construction, pipeline and tie-in work. Well abandonments and salvage for oil and gas wells including heavy-oil, SAGD and oil sands plants, batteries and lease infrastructure. Every scope of all sizes is managed to a schedule that respects production.
ARES uses a self-developed software called CLASH IQ, an owned AI clash detection app applied to all designed construction projects — construction interferences are found in the design phase and resolved before crews reach the field.

Commercial industrial construction

Facility construction

Oil/gas wellsite abandonments
Scope of work
Project & construction management
Single-point management of subtrades, materials, permits and documentation, plus design services with AI-based 2D model clash detection so interferences are resolved on screen rather than in the field.
Commercial & industrial builds
Warehouses, multi-level office buildings, shops, storage and support structures, from site prep through commissioning, including structural concrete services: foundations, piles and raft slabs.
Facility construction
Battery, plant and lease facility builds and modifications: structural piling, foundations, piping, skid setting, tie-ins and commissioning support, sequenced around live production.
Well abandonments
Downhole and surface abandonment, cut-and-cap, wellsite decommissioning and reclamation support, executed to provincial regulatory standards with the closure documentation to prove it. Asset salvage and removal functions available.
Inspection & repair
Scheduled inspection and repair programs that catch failures before they take production with them.
Delivery
How a project runs.
01
Site review
We walk it, confirm conditions and identify what the drawings do not show.
02
Scope & schedule
A written scope with crew, equipment, price basis and a date that accounts for production.
03
Execution
One accountable lead on site, daily progress reporting, change control in writing.
04
Handover
As-built documentation, close-out package and the service plan that keeps it running.
Have a build, cleaning scope or abandonment on the schedule?
Send drawings or a description and the target window. We will come back with scope, crew and a realistic date.
Request a scope